The Burbs Police Department
Burbs Code Reference
O.C.B.A. § 8-2-164
Licensing and permits.
Title 8. Buildings and Housing · Chapter 2. Standards and Requirements for Construction and Alteration of Buildings and Other Structures · Article 2. Factory Built Buildings and Dwelling Units · Part 3. Installation of Manufactured Homes and Mobile Homes
Statutory text
During such time as the Commissioner has contracted or entered into cooperative agreements pursuant to his or her authority under Code Section 8-2-160.1:
(1) Any installer performing any installation of a manufactured home or a mobile home in this state shall first obtain a license from the Commissioner; provided, however, that persons employed by or contracting with a licensed installer to perform installations shall not be required to obtain such license; and
(2) In addition to the requirements of paragraph (1) of this Code section, any installer performing any installation of any new or pre-owned manufactured or mobile home in this state shall first purchase a permit from the Commissioner. The cost of such permit shall be $60.00 for each manufactured or mobile home. Each installer shall provide any information required by the Commissioner to be submitted to obtain a permit. A permit shall be attached by the installer to the panel box of each manufactured or mobile home upon completion of installation.
- Source
- V5 · 2024, page 938–938. Including Acts of the 2025 Regular Session of the General Assembly. Official source PDF (legis.ga.gov)
- Version
- Edition ocga-2025-supplement-v3 · Matched to source
- History
- Code 1981, § 8-2-164, enacted by Ga. L. 1992, p. 2750, § 3; Ga. L. 2004, p. 607, § 2; Ga. L. 2010, p. 9, § 1-22/HB 1055.
